At Fieldman, we’ve seen these issues firsthand—and we’ve built tools to stop them before they start.
Let’s walk through three critical checkpoints in every AMI deployment and how real-time validation helps you avoid billing errors—and those dreaded headlines about $10,000 water bills.
It’s not enough for a technician to show up at the right property. The real challenge is validating that the specific meter being replaced actually belongs to that address — and that it’s the one authorized for replacement.
In multi-meter scenarios, where inactive units and neighboring service lines coexist, it’s easy for a technician to install the right meter in the wrong spot. And that small mistake? It causes a data mismatch that disrupts billing and frustrates residents.
The result?
With Fieldman, location and asset validation are non-negotiable. Our field service mobile app verifies the meter while the technician is in the field, matching it against the work order and property — so replacements are always accurate and billing stays intact.
Once the right meter is identified, the next step is just as critical: validating the final meter reading before removal.
Why? Because that reading becomes the last “receipt” of consumption before billing resets with the new meter.
The problem? Meters vary. Dials, decimals, faded screens—there’s a lot of room for error. And when apps rely on manual entry with no checks in place, even a tiny typo can result in wildly incorrect bills and huge customer frustration.
We’ve seen utilities spend $200,000+ per month just to manually review these readings.
Fieldman solution solves this at the source:
The result? Up to 90% fewer manual reviews, faster billing cycles, and fewer phone calls from confused customers.
Swapping out the meter is just the beginning. Recording the new meter’s serial number correctly — and matching it to the right project and customer account — is what closes the loop.
Without validation, it’s easy to install a meter from the wrong inventory batch. One city orders 10,000 meters, splits them between contractors and internal teams, and suddenly, meters from the wrong pile end up in the ground. Now nobody knows who used what, invoices are delayed, and the billing system is missing reads.
Fieldman stops this in real time:
Our system processes millions of serial numbers in seconds, allowing large smart meter deployments to move fast without sacrificing accuracy.
We know AMI work doesn’t happen in perfect conditions. A technician might be in a basement, a rural area, or without a signal altogether. That’s why Fieldman’s offline mode still delivers full validation power—so technicians can work with confidence and sync everything once they’re reconnected.
Whether you’re replacing 100 or 100,000 meters, real-time validation is what keeps your project on track, your team productive, and your customers happy.
Every utility dreads the phone call that starts with “I just got my bill and…” — especially when that call could’ve been avoided.
Fieldman’s asset and work order management platform is designed to catch and prevent mistakes before they make their way to the billing system.
Prefer to watch a webinar about real-time data validation? Watch it here or check out our YouTube channel.
Want to learn more? Download our free AMI Deployment Guide or book a quick demo with our team to see how we can help you deliver a smoother, smarter rollout.
Explore how you can streamline operations with Fieldman platform
Book a Demo