3K Water Meters, One Platform: How D&B Utility Delivered Hutto, Texas — On Budget

In 2026, the City of Hutto, TX began replacing 2,922 water meters with new Kamstrup units. Most of that work fell outside a standard contract, covering box changes, lid replacements, and full documentation for every meter. The challenge was to deliver it all without busting the city budget.

Project: Smart Meter Rollout

Solution: Work Order Manadgement (WOM)  for Smart Meter Deployment

Key Feature: Customizable workflows for meter installs, box changes, and lid replacements

Location: Hutto, Texas

2,922 Kamstrup meters installed
Project delivered within the city's budget
Full field-verified asset location

The problem with a typical meter install

Most municipalities hire a contractor for a meter deployment, expecting exactly that: meters installed in budget. What often gets left behind are discoveries of outdated infrastructure  and  the smaller, less glamorous parts of the job — locating aging infrastructure, fixing damaged boxes, replacing worn lids — that a strict "install-only" scope doesn't cover.

How D&B Utility and Fieldman delivered more in Hutto

Between April and July 2026, D&B Utility used Fieldman to manage the City of Hutto's 2,922-meter Kamstrup deployment from start to finish — not just the install.

The Fieldman team configured the WOM system to match project requirements and billing integration, consulted on deployment planning, and built a workflow to document all box changes and lid replacements — work that typically falls outside a standard contract — all while staying within the city's actual budget.

Every address in the project was tracked on a live map inside Fieldman, showing the real-time status of each work order across Hutto: available, assigned, or completed. Each finished install was backed by field photos of the old and new meters, along with a full record tied to the address — previous meter number, new meter number, readings, and job history. That documentation gave the city a clear, verifiable audit trail for all 2,922 installs, with no guesswork about what was done and when.

Fieldman's AMI experience, applied to Hutto

This project reflects how Fieldman works across AMI and water-meter deployments: a platform flexible enough to be configured around each utility's actual requirements, paired with hands-on support and consulting. Fieldman handled the integration and gave the utility direct access to the platform itself, bringing the full visibility that let D&B Utility plan deployments, adapt workflows on the fly, and equip technicians to handle whatever the field throws at them.

Most contractors show up, bang in the meters, and mail you an invoice. We did it a little differently in Hutto, Texas. We helped the city locate everything, consulted on meter deployment, handled the box changes, and the lid replacements nobody likes doing. And we did all of it inside the budget they actually had, not the one we wished they had. That's the line between a contractor and a partner. We'd rather be the second one.
Trevor Beck
President at D&B Utility

Explore how you can streamline operations with Fieldman platform

Book a Demo
Other Client Stories

How Englewood Residents Booked Smart Meter Appointments in Just Five Clicks

Read Now

How Fieldman Made Citrus County’s AMI Project Twice as Efficient

Read Now

From $500 K to $6 Million: How D&B Utility Grew in 3 Years with Fieldman WOM Solution

Read Now